 |
|
|
| |
TRYBE: AN OPERA IN PAINT
TOURING COMPANY |
1 Artist performer : Anthony Breslin 1 Musician performer : Greg Long 5 Dancers 1 Stage manager |
DRESSING ROOMS |
| The performance area may have paint from the performance spilled on it. The cleaning and/or protection of the immediate performance and green room areas is not the responsibility of the performers. One dressing room within easy access to stage with standard facilities including toilet, wash basin, mirrors, shower, iron + board (if possible). One of the dressing rooms needs to be large enough to comfortably accommodate 7 artists. |
STAGING |
A minimum ceiling height of 6000m must be available to allow the filming of the work from above the canvas.
Performance area of approx 7m x 7m. The performance area needs to be built from wood or have a masonite floor put down so that the 4.2m x 3.8m canvas can be attached with staple.
Black valances 4(number) 10'x7.5'
Long trestle table for audio equipment. |
AUDIO REQUIREMENTS |
| Speakers: 4 x RCF 312ART (Active) |
| Speakers: 1 x RCF 4PRO8001 subwoofer |
| Speaker stands x 4 |
| Mixing desk : 8 Channel (not Behringer) |
| 2 x SM 58 microphones |
| 2 x boom microphone stands |
| 2x Stereo 31 band grpahic equalizer |
| 4 x BSS AR-133 direct inject boxes |
VIDEO REQUIREMENTS |
| 12'x9' Truss screen |
| 6000 Lumens data DLP projector |
| 4 channel vision switcher to accommodate extra handheld camers in use |
| 3ccd DV video camera with native 4:3 filming ratio |
| DV recording device (Hard disk recorder) |
| 9" Broadcast preview monitor |
LIGHTING / RIGGING |
| Adequate lighting must be rigged above the performance area |
| 6 x 400w Metal Halide Flood Light (minimum) |
| Lighting will need to be configured to suit the performance area. |
| 32 AMP 3 phase power outlet |
| Rigging to mount camera approx. 6000m from the canvas on stage |
CREW |
| 1 person with vision mixing skills |
| 1 person with lighting skills |
ACCES TO THE VENUE AND SCHEDULE |
Day 1
|
Bump-in, tech check (approximately 8am - 3.00pm) Day 1 rehearsal technician required from 6pm (approximately 4pm - 11.00pm) |
| Day 2 |
Day 2 tech rehearsal continues, dress rehearsal, first performance (time TBC) |
| Day 3 |
Performance |
| Day 4 |
Performance |
| Day 5 |
Performance |
| Day 6 |
Performance |
Day 7
|
Performance |
| N.B. Separate rehearsal space may be required for the artists during day 1 of bump in (times TBC). |
CATERING |
| Sandwiches and fruit for 8 TRYBE performers |
| Soft drinks, juices, bottled water. |
PLEASE NOTE |
| This document has been to produced as a guide. Every effort has been made to cover all details relating to the show's technical needs. Please note that adaptations to match the facilities available can be done in conjunction with the venue's Production Coordinator, and in agreement with the Tour and Technical manager. Additional requirements may come out of discussion with, and in agreement with, the venue's Production Coordinator. |

| | |